Contact Us: 786.229.4416

Program Controls Inc.

Program Controls Inc.

  • Home
  • About
    • Our Story
    • Vision
    • Mission
    • Core Values
    • Leadership
    • Our Clients
    • Certifications
    • Inside PCI
  • Services
    • Program Management
    • Program Controls
    • Construction Services
    • Estimating
  • Sectors
    • Aviation
    • Water
    • Port
    • Transportation
    • Education
    • Commercial
  • Projects
  • Careers
  • Contact

MIA Skytrain North Terminal

The APM system project (Skytrain) connects the mile-long North Terminal with four stations from one end to the other.  The Skytrain, constructed on the roof-level of the facility, was designed with a pinched-loop alignment and runs four 4-car driverless trains in a synchronous manner to provide a capacity of nearly 9,000 passengers per hour per direction. The maintenance and storage facility, car wash facility and the central control room for the Skytrain are also located on the fifth level. Total cost $130 Million.
Categories
Aviation
Tags
Program ManagementProject Controls
Client
Miami-Dade Aviation Department
© 2025 Program Controls Inc. | All Rights Reserved. | Website Design by DESIGNTIFF
Shopping Basket